Illinois Commercial Building Permit Cost Estimator

Estimate the cost of a commercial building permit in Illinois based on your project's construction valuation, type, and municipality size. Fees are calculated using ICC/IBC-based sliding scale schedules commonly adopted across Illinois jurisdictions.

Enter the total estimated cost of construction (materials + labor).
Used to calculate plan review and inspection fees.

Formula & Fee Schedule

Base Building Permit Fee — ICC sliding-scale schedule (widely adopted in Illinois):

  • $1 – $500: $23.50 flat
  • $501 – $2,000: $23.50 + $3.05 per $100 (or fraction) over $500
  • $2,001 – $25,000: $69.25 + $14.00 per $1,000 over $2,000
  • $25,001 – $50,000: $391.25 + $10.10 per $1,000 over $25,000
  • $50,001 – $100,000: $643.75 + $7.00 per $1,000 over $50,000
  • $100,001 – $500,000: $993.75 + $5.60 per $1,000 over $100,000
  • $500,001 – $1,000,000: $3,233.75 + $4.75 per $1,000 over $500,000
  • $1,000,001+: $5,608.75 + $3.65 per $1,000 over $1,000,000

Project Type Multiplier: New/Addition = 1.00 × | Alteration = 0.85 × | Change of Occupancy = 0.70 ×

Municipality Multiplier: Large (100k+ pop.) = 1.20 × | Medium = 1.00 × | Small/Village = 0.90 ×

Plan Review Fee = Base Fee × 65%

Inspection Fee = (Sq Ft × $0.08) + ((Stories − 1) × $75)

Fire Suppression Permit = $150 + (Sq Ft × $0.12)

Electrical Permit = max($150, $100 + Sq Ft × $0.04)

Plumbing Permit = max($125, $75 + Sq Ft × $0.035)

HVAC / Mechanical Permit = max($100, $75 + Sq Ft × $0.03)

Illinois CDB State Surcharge = Base Fee × 1%

Total = Base + Plan Review + Inspection + Fire + Electrical + Plumbing + HVAC + State Surcharge

Assumptions & References

  • Base fee schedule follows the ICC Building Valuation Fee Table adopted by the majority of Illinois municipalities via the Illinois Municipal League model ordinance.
  • Plan review fee of 65% of base permit fee is the ICC model ordinance standard and is used by Chicago, Aurora, Naperville, and most Illinois jurisdictions.
  • Construction valuation should reflect total project cost (materials + labor), consistent with IBC Section 109.3 and Illinois local ordinance requirements.
  • Fire suppression permit fees are based on the Illinois State Fire Marshal schedule and typical local fire district fee structures.
  • Electrical permit fees reference the Illinois Commerce Commission and local electrical inspection authority schedules.
  • Plumbing permit fees are based on the Illinois Plumbing Code (225 ILCS 320) and local health department schedules.
  • The Illinois Capital Development Board (CDB) surcharge of 1% applies to commercial permits per 20 ILCS 3105/10.02-1.
  • Municipality size multipliers reflect documented fee differentials between large, medium, and small Illinois jurisdictions based on published fee schedules from Chicago, Rockford, Springfield, Naperville, Peoria, and sample villages.
  • Chicago uses a separate, more complex fee schedule; this tool provides a reasonable approximation for planning purposes.
  • This tool provides estimates only. Actual permit fees must be confirmed with the applicable local building department prior to permit application.

In the network