Florida Impact Fee Estimator

Estimate total development impact fees in Florida based on land use type, unit count, and county. Fees cover roads, schools, parks, water/sewer, and fire/EMS infrastructure.

Formula

Total Impact Fee = Σ (Fee Category Rate per Unit × Number of Units)

Where fee categories are:

  • Transportation Fee — based on trip generation rates × cost per trip × credit for existing infrastructure
  • School Impact Fee — based on student generation rate × cost per student station × credit ratio
  • Parks & Recreation Fee — based on persons per unit × acres per person × land/improvement cost
  • Water & Sewer Fee — based on equivalent residential connections (ERCs) × system capacity cost
  • Fire & EMS Fee — based on call generation rate × cost per call × facility/equipment cost

Each county calculates fees using the rational nexus methodology required under Florida Statute §163.31801, ensuring fees are proportional to the infrastructure demand created by new development.

Assumptions & References

  • Fee rates reflect 2023–2024 adopted schedules from each county's impact fee ordinance
  • Single-family fees are tiered by home size (square footage) as adopted by most Florida counties
  • Commercial/retail fees are assessed per 1,000 gross square feet of building area
  • Hotel fees are assessed per guest room
  • School impact fees apply to residential uses only (per Florida law)
  • Water & sewer fees may be charged separately by utility authorities (e.g., JEA, FGUA)
  • Municipal impact fees (city-level) are not included — additional fees may apply within city limits
  • Florida Statute §163.31801 governs impact fee methodology and caps annual increases at 12.5% per year (25% over 4 years)
  • Sources: Orange County BCC, Hillsborough County BOCC, Miami-Dade WASD, Broward County Planning, Palm Beach County, Pinellas County, COJ/Duval, Seminole County, Volusia County, Polk County fee schedules
  • This tool provides estimates only. Consult the county building department or a licensed land use attorney for project-specific fees

In the network